Office building and display block for the National Academy of Construction in Hyderabad, Andhra Pradesh.
Fully air- conditioned indoor Stadium meeting DIN standards and certified by FIBA in Hyderabad, Andhra Pradesh.
Traffic and Transit Management Centers constructed at various locations of the Bangalore Metropolitan Transport Corporation (BMTC), Karnataka.
Civil, structural and associated UG piping works of VGO-HDT, DHDT and HCDS units (EPCM-4) for IOCL Paradeep Refinery in Odessa.
Civil, structural and associated UG piping works of VGO-HDT, DHDT and HCDS units (EPCM-2) for IOCL Paradeep refinery in Odessa.
Construction of Hydrogen unit and Sulphur Recovery units on EPC basis through Joint Venture partnership with Uhde Germany & Uhde India Private Limited for NOCL, Cuddalore, Tamil Nadu.
3610 m long elevated viaduct having 7220 m of precast parapet casting and erection for Bangalore Metro Rail Corporation Limited.
Construction of Gandikota Dam, Kadapa District, AP across Penna River and earthwork excavation of GNSS Main Canal.
Gundlakamma Reservoir Project for Govt. of AP involving formation of left earth dam including head sluice and spillway.
Construction of the right main canal and distribution system for Thotapalli Barrage Project For Govt. of Andhra Pradesh.
Formation of balancing reservoir of 1.514 TMC at Ramatheertham Village, Chimakurthy Mandal, Prakasam District, Andhra Pradesh.
Design, construction, testing commissioning and operation & maintenance of Kutch Branch Canal Package I, Gujarat on Engineering, Procurement, construction & commissioning (EPC) basis.
Construction of Saradih with vertical lift gates and other appurtenant works across Mahanadi River and construction of bridges including operation and maintenance for two years after completion in District Janjgir –Champa, Chhattisgarh.
Krishna Drinking Water Supply Project: Lying of 2200 mm. diameter MS pipeline covering a distance of 59.5Kms near Hyderabad, Andhra Pradesh.
Maharashtra Airport Development Company Ltd.: Designing, providing and constructing Water Supply and Underground Sewerage System in MIHAN Project Area, Nagpur.
Gujarat Water Resource Development Corporation Limited : EPC contract for providing and laying MS pipeline from Narmada main Canal Chainage 218.00kms at Jalundra to Sujatam Sufala Spreading Canal at Madhavgarh and pumping station at Jalundra.
Gujarat Water Resources Development Corporation Limited :EPC Contract for providing and laying MS pipeline from Narmada Main Canal Chainage 311.00 Kms. At Modhera to Sujalam Sufalam Spreading Canal at Motidau and Pumping Station, Modhera.
Irrigation & CAD Department, Andhra Pradesh : Phase II of J Chokka Rao GLI Project for lifting 14 cumecs of water from River Godavari to create an irrigation potential of 2.85 lakh acres.
Widening and strengthening of the existing 46.2 kms. Stretch of road on NH 5 between Vishakhapatnam and Champavati in Andhra Pradesh.
Phase II of the Ahmedabad - Vadodara access Controlled 50 kms. Six lane expressway in Gujarat on NH 8
Rehabilitation and upgradation, four laning of East West Corridor Project in Gujarat –Length totaling 247 kms.
Four laning and strengthening of 30 kms of the existing two lane section on NH 2 –a portion of the Golden Quadrilateral Projects in Bihar including construction of 3.1 kms long major bridge on River Sone .
Construction of elevated highway project of Bengaluru –Hosur Section of NH 7 in Bengaluru from Silk Board Junction to Electronic City.
Construction of 8 lane access controlled expressway as Outer Ring Road (Northern Arc) of Hyderabad City, Andhra Pradesh.
Four laning of 44 kms of sections of Lucknow to Muzaffarpur highway, a World Bank aided National Highway Project, On NH 28, Uttar Pradesh.
Rehabilitation & Up – gradation to 4/6 Lane Divided Carriageway configuration from 37.75 to 69.8 of Darbhanga to Muzaffarnagar Section of NH-57 in the State of Bihar Under Phase-II.
Four laning and strengthening of the existing lane of NH-7 Madurai- Kanyakumari Section Widening to 4 laning and strengthening of the existing 2- lane carriage way in Hosur- Krishnagiri section of NH -7 construction of 2 lane for durg bypass Triunelvelli Project.